Friday, June 7, 2019
Project manager for a Cable Planning Essay Example for Free
Project manager for a pipeline Planning EssayAs the project manager for a Cable Planning team, I give manage the creation of the cable plan for a new building that will be built, with construction set to become in six weeks. My first task in creating a Cabling Plan is to develop an Executive Summary that will contain the Project Introduction and root word Cable Specifications and measures. My manager gave me the overall project plan that includes A detailed description of the new building, including the total number of computers for all of the employees of the company. Also the server and entanglement topology hardwargon that is required to put the system together.Cable Standards and CodesANSI/NEMA Standards Publication No. WC 66-2001Performance Standard for Category 6 and Category 7 degree Celsius Ohm Shielded and Unshielded Twisted Pair CablesANSI/TIA/EIA-526-7Measurement of Optical major power Loss of Installed Single-Mode Fiber Cable PlantANSI/TIA/EIA-526-14AOptical magnate Loss Measurements of Installed Multimode Fiber Cable PlantBICSI TDMMTelecommunications Distribution Methods Manual, 11th EditionCENELEC EN 501732000 and amendmentsInformation Technology Generic Cabling SystemsIEC/TR3 61000-5-2 Ed. 1.0 and amendmentselectromagnetic compatibility (EMC) function 5 foundation and mitigation guidelines Section 2 Earthing and cablingISO/IEC 118012002 Ed 2.0 and amendmentsInformation technology Generic cabling for customer premisesNFPA70 National Electric Code term 645 and Article 800 2.2.15. NFPA 70E Standard for Electrical Safety in the Workplace, 2004 Edition 2.2.16. NFPA 75 Standard for the Protection of Information Technology Equipment, 2003 Ed.Building Standards and CodesANSI/TIA/EIA-568-B.1, ANSI/TIA/EIA-568-B.2, ANSI/TIA/EIA-568-B.3, and addenda technical Building Telecommunications Cabling Standard Part 1 General Requirements Commercial Building Telecommunications Cabling Standard Part 2 Balanced Twisted-Pair Cabling Components (December 2003) Commercial Building Telecommunications Cabling Standard Part 3 Optical Fiber Cabling and Components StandardANSI/TIA/EIA-569-B and addendaCommercial Building Standard for Telecommunications Pathways and SpacesANSI/TIA/EIA-606-A and addendaAdministration Standard for the Telecommunications Infrastructure of Commercial BuildingsNFPA 76Standard for the Fire Protection of Telecommunications Facilities, 2005 EditionANSI-J-STD-607-A and addendaCommercial Building Grounding and Bonding Requirements for TelecommunicationsProject MaterialsFiber-Optic Design Considerationsa)We will be utilizing eccentric optics in versatile ways. We will be crafting thebackbone, and riser runs with fiber optic cables.Basement Server Complex Designa)The server will have a network power that exceeds the 110 people/computers in the basement. One computer per person. b)We will patch separately of these computers to the wall outlet with standard Cat6 patch cables. c)Risers and backbones will be constructed with fiber optic cables. d)Horizontal runs with utilize Cat6 cabling.e)We will need 5 Cisco WS-C3750 G-24PS-S24 Ports gas pedal switches to maintain the minimum standard of having 4 ports free on each(prenominal) switchStandard Floor Designa)The network capacity of this design is to exceed 200 people/computers. One computer per person. b)I will patch each of these computers to the wall outlet with standard Cat6 patch cables. c)Risers and backbones will be constructed with fiber optic cables. d)Horizontal runs with utilize Cat6 cabling.e)I will need 10 Cisco WS-C3750 G-24PS-S24 Ports catalyst switches to maintain the minimum standard of having 4 ports free on each switch.Fiber-Optic Characteristicsa)SC connectors will be used to terminate optical cables.Bandwidtha)The hardware we are installing will have a speed of 1Gbps.Attenuationa)I will use special tools to test for attenuation as the project progresses, and replace accordingly. Electromagnetic Immunitya)I will p eriodically test for interference.Link Performance Analysisa)I will schedule periodic tests to verify performance, and bandwidth speeds.Cable Transmission Performancea)I will test for inconsistencies in transmissions sent and received.Splice and Connector Performancea)I will test each termination and connector to ensure it meets or exceeds the expected standards.Power Budgeta)I will calculate each devices power requirement, to ensure adequate power is provided. b)I will use energy efficient methods, which will not chip in performance, but ensure that utility costs do not exceed the budget. Standard floor layout
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment
Note: Only a member of this blog may post a comment.